Difference between revisions of "Directorate of Requirements and Production (MI6)"
Tom Griffin (talk | contribs) m (→Director of Production and Requirements (D/PR)) |
Tom Griffin (talk | contribs) m (→Structure) |
||
Line 10: | Line 10: | ||
**Controller, Global and Functional(C/GF) | **Controller, Global and Functional(C/GF) | ||
**Controller, UK (C/UK) | **Controller, UK (C/UK) | ||
− | **(RGC) | + | **Requirements, Government Communications (RGC) |
**Requirements, Economic Intelligence (R/Econ) | **Requirements, Economic Intelligence (R/Econ) | ||
**Requirements, Technical Intelligence (R/Tech)<ref>Philip H.J. Davies, MI6 and the Machinery of Spying, Frank Cass, 2004, p.302.</ref> | **Requirements, Technical Intelligence (R/Tech)<ref>Philip H.J. Davies, MI6 and the Machinery of Spying, Frank Cass, 2004, p.302.</ref> | ||
+ | |||
==People== | ==People== | ||
===Director of Requirements and Production (D/PR)=== | ===Director of Requirements and Production (D/PR)=== |
Revision as of 00:21, 25 March 2011
The Directorate of Requirements and Production is the apparent name of a major directorate within the Secret Intelligence Service MI6.[1]
Structure
Philip H.J. Davies' 2004 book MI6 and the Machinery of Spying describes the structure of the directorate as follows:
- Director of Requirements and Production (D/PR)
- Controller, Europe (C/EUR)
- Controller, Central and Eastern Europe (C/CEE)
- Controller, Middle East (C/ME)
- Controller, Far East (C/FE)
- Controller, Global and Functional(C/GF)
- Controller, UK (C/UK)
- Requirements, Government Communications (RGC)
- Requirements, Economic Intelligence (R/Econ)
- Requirements, Technical Intelligence (R/Tech)[2]
People
Director of Requirements and Production (D/PR)
- Barrie Gane -1993[3]
- David Spedding 1993-94