Difference between revisions of "Directorate of Requirements and Production (MI6)"

From Powerbase
Jump to navigation Jump to search
Line 5: Line 5:
 
*Director of Requirements and Production (D/PR)
 
*Director of Requirements and Production (D/PR)
 
**Controller, Europe (C/EUR)
 
**Controller, Europe (C/EUR)
−
**Controller, Central and Eastern Europe (C/CEE)
+
**[[Central and Eastern Europe Controllerate (MI6)|Controller, Central and Eastern Europe]] (C/CEE)
 
**[[MI6 Middle East and Africa Controllerate|Controller, Middle East]] (C/ME)
 
**[[MI6 Middle East and Africa Controllerate|Controller, Middle East]] (C/ME)
 
**Controller, Far East (C/FE)
 
**Controller, Far East (C/FE)

Revision as of 23:15, 30 March 2011

The Directorate of Requirements and Production is the apparent name of a major directorate within the Secret Intelligence Service MI6.[1]

Structure

Philip H.J. Davies' 2004 book MI6 and the Machinery of Spying describes the structure of the directorate as follows:

  • Director of Requirements and Production (D/PR)
    • Controller, Europe (C/EUR)
    • Controller, Central and Eastern Europe (C/CEE)
    • Controller, Middle East (C/ME)
    • Controller, Far East (C/FE)
    • Controller, Global and Functional(C/GF)
    • Controller, UK (C/UK)
    • Requirements, Government Communications (RGC)
    • Requirements, Economic Intelligence (R/Econ)
    • Requirements, Technical Intelligence (R/Tech)[2]

People

Director of Requirements and Production (D/PR)

Notes

  1. ↑ Philip H.J. Davies, MI6 and the Machinery of Spying, Frank Cass, 2004, p.302.
  2. ↑ Philip H.J. Davies, MI6 and the Machinery of Spying, Frank Cass, 2004, p.302.
  3. ↑ Stephen Dorril, The Silent Conspiracy: Inside the Intelligence Services in the 1990s, Mandarin, 1994, p.760.